What:

Our client needed a new non-slip surface on the landing area at the top of the main staircase.

Client:

Thomas & Mack Center, an arena located on the campus of the University of Nevada, Las Vegas

What was the biggest challenge on this job?

We needed to provide a surface that can be maintained by the in-house facilities team that was also durable and long lasting. The goal was to coat the surface without losing the aesthetic of the original floor.

What was the substrate?

Composite deck system—lightweight concrete over fiberglass and steel

Which products were used?

Seal-Krete Lock Down Bonding Primer, Seal-Krete Floor-Tex

Size of project in square feet?

3,000

Time to completion:

4 days