What:

A World War II era floor in an aging building needed a makeover.

Client:

Maryland Motor Vehicle Administration, Annapolis, MD

What was the biggest challenge on this job?

At more than 70-years-old, the floor in a maintenance shop at this facility was in bad shape. An uneven surface, cracks and other issues made this job particularly challenging. Seal-Krete High Performance products brought the floor into the 21st Century.

What was the substrate?

Concrete in poor condition

What products were used?

Hard Surface Primer, Poly-Shell Flex-Coat, Epoxy-Shell 1000

What was the size of the project in square feet?

3,000

Time to completion:

1 week