70-year-old floor made modern again
What:
A World War II era floor in an aging building needed a makeover.
Client:
Maryland Motor Vehicle Administration, Annapolis, MD
What was the biggest challenge on this job?
At more than 70-years-old, the floor in a maintenance shop at this facility was in bad shape. An uneven surface, cracks and other issues made this job particularly challenging. Seal-Krete High Performance products brought the floor into the 21st Century.
What was the substrate?
Concrete in poor condition
What products were used?
Hard Surface Primer, Poly-Shell Flex-Coat, Epoxy-Shell 1000
What was the size of the project in square feet?
3,000
Time to completion:
1 week